|
This was the first theatre in London to make use of a high-tension steel wire grid, allowing easy access for rigging and placement of lighting and sound equipment.
This Cablenet high level platform uses a custom designed 8 x 8m frame, square at the stage end with a curve at the auditorium end.
- Architect: Avery Associates
- Contractor: Laing Ltd
- Theatre consultant: Theatre Projects Consultants
|